2026 cost reference
Mitigation is not the rebuild
Extraction, drying, dehumidification and monitoring are the first phase. Replacing drywall, flooring, insulation, trim and paint is a separate reconstruction scope. A quote should make clear which phase its total covers.
Water category affects the mitigation rate
Published 2026 data places clean water at the low end and contaminated black water at the high end because safety, disposal and material-removal requirements increase.
Acting quickly changes the scope
The longer materials stay wet, the more likely porous finishes are to require removal and mold becomes a concern. The calculator does not invent a time multiplier; instead, you enter the rebuild area you actually expect to replace.
The calculator uses the same reviewed source ranges shown on this page.
These figures may be quoted with attribution and a link. Source-check date: August 29, 2026.